SH200A3 Excavator planet carrier final drive
SH200A3 Excavator planet carrier final drive Condition: New
Applicable Industries: Machinery Repair Shops, Manufacturing Plant, Farms, Retail, Construction works, Energy & Mining
Showroom Location: None
Video outgoing-inspection: Provided
Machinery Test Report: Provided
Marketing Type: Ordinary Product
Warranty: 1 Year
After Warranty Service: Video technical support
Local Service Location: None
After-sales Service Provided: Video technical support
Category: Construction Machinery Parts
Equipment: Apply to KOBELCO SK07N2 Excavator
Item Condition: New
Application: Replacement
Inner Packing: Wrap by Plastic Film
Outer Packing: Carton, Plywood Case
Delivery: By Sea, Air, Carrier
Packaging Details: INNER PACKING: Wrap by plastic film, clear label for each item.
OUTER PACKING: Carton or Plywood Case
PACKING SIZE: Depend on packing type
Port: Shanghai/Ningbo
High quality excavator planet carrier final drive part Apply to SH200A3 Excavator
Products Description
PART NAME | CARRIER Travel 1st Stage |
EQUIPMENT | Apply to SUMITOMO SH200A3 Excavator |
PART No. | LS00130 |
SERIAL No. | – |
STOCK CODE | 0203421 |
HOLES | 3 |
PROCESSING | Casting |
CATEGORY | Construction Machinery Spare Parts |
INSTALLATION | Travel Reduction Gearbox |
APPLICATION | Replacement |
ITEM CONDITION | NEW |
LOGO | Neutral,OEM acceptable,etc |
MOQ | 1 pc |
DESCRIPTION: | |
1. Ready to installed in your SH200A3 excavators. | |
2. All components are produced by us. | |
3. All new, undamaged. | |
4. 90 days warranty, call or email with any questions. | |
5. Carton or Plywood Case Packing, free of fumigation | |
6. Deliver to worldwide by Sea, Air, or Courier. | |
RELATED PARTS FOR SH200A3: | |
LB00549 | LR00584 |
LB00550 | LR00585 |
LB00551 | LR00586 |
LB00552 | LR00587 |
LC00163 | LS00129 |
LC00164 | LS00130 |
LC00165 | LV00029 |
LC00166 | |
LR00583 |
SH200A3 Excavator planet carrier final drive Picture
Packaging & Shipping
TRADE TERMS | EXW, FOB, CFR, CIF |
PAYMENT TERMS | T/T, Western Union, Escrow |
PORT | Ningbo Port, negotiation |
LEAD TIME | 1. Stock in hand: 4-7 days for processing and packing2. Bulk Production: 10-35 days, depend on the quantity. |
DELIVERY | By Sea, Air, Carrier |
ORDER FLOW | 1. Customers offer the part number, part name, model, quantity, data of items, delivery term.2. We quote the best price according to the requirement of customers.3. Confirm the purchase order and pay the deposit.4. We prepare and pack the goods.5. Customers make the payment according to the Proforma Invoice once the goods get ready for delivery.6. We delivery the goods with the packing list, commercial invoice, B/L and other documents requested.7. Track the transport and arrival about the goods.8. Welcome to give us suggestion and feedback once arrival. |
Reviews
There are no reviews yet.